CONSTRUCTIEBEREKENINGLaten maken
Across the NetherlandsClear quotationCalculations and drawingsDiscuss your project ↗
Home/Structural calculations for a new build
Your project • New build

Structural calculations for a new build

From architectural design to a coordinated set of structural documents.

Price on request

A clearly defined brief. Your quotation confirms the final price.

Structural calculations for a new build — illustrative concept

What does this project require structurally?

For new buildings, structure, architecture and services need early coordination. Large open spaces, cantilevers and heavy external walls require explicit design choices. Agreements about the lead structural engineer, specialist calculations and checking prevent uncertainty.

Which information helps with your enquiry?

  • Current architectural model or drawings
  • Project requirements
  • Cone penetration test
  • Agreements with suppliers and advisers

You do not need to have everything ready. State which documents are available and what is still unknown. We first assess whether there is enough information to define the brief. A site survey or further investigation may be necessary.

What can your brief include?

  • Structural design for the stages stated in the quotation
  • Calculations and drawings within scope
  • Coordination of relevant structural interfaces

The quotation records which elements will be calculated and drawn, the information used as a starting point and when the documents will be delivered. This makes the scope clear to you, your adviser and your contractor.

What is not automatically included?

Architectural drawings, ground investigations, archive research, site visits, supplier calculations, temporary support and construction supervision are included only when explicitly agreed. Materials and construction work are outside the calculation fee.

Permits and structural assessment

Check the procedure for your activity and location through the Dutch Omgevingsloket. A structural report substantiates the agreed elements; it does not determine whether the entire building proposal is permitted.

Read about permits and the municipality's role

From information to final project documents

Once your enquiry is agreed, the design basis is recorded, calculations and drawings are prepared and internally checked. Your contractor receives the final documents with a revision reference. Any discrepancy in the existing situation or change to your plans must be reported before work on the affected element continues.

View the process

A structural plan.
Clear answers to follow-up questions.

If the municipality requests additional structural information about our calculations within the original brief, we provide that information within the agreed scope at no additional professional fee.

The municipality makes the permit decision.

View the terms
Frequently asked questions

Another question?

Can I enquire without original drawings?

Yes. Send photos, a sketch and a description of your plans. We identify the missing information. Archive research, a site survey or further investigation may be needed and will be agreed separately.

What does the approval guarantee cover?

If the municipality requests additional information about our calculations within the original brief, we provide it within the agreed scope at no additional professional fee. This does not guarantee a permit. Read the terms on the guarantee page.

How soon will the documents be ready?

The schedule is confirmed in the quotation after your information has been assessed. The completeness of the drawings, further investigations and the scope of calculations determine the turnaround time. Include your preferred date in your enquiry.

Your plans, clearly documented

From renovation idea to structural plan.

Tell us what you want to change. Upload drawings or photos and receive a quotation suited to your project.

Request a quote